What a site screen brings together

One preliminary screen, six evidence dimensions

A site screen organizes the relevant evidence scattered across agencies, utilities, filings, and maps — into a single source-backed brief. Findings are traceable; unknowns are clear.

Grid & InterconnectionRequires deeper diligence

Published interconnection context, assembled

Queue position, nearby substations, transmission corridors, and published capacity signals — drawn from public ISO/utility filings where available.

ISO interconnection queue· SRC-01Utility public filings· SRC-02
Parcel & JurisdictionVerified

Parcel, zoning, and jurisdiction basics

APN, ownership, acreage, zoning designation, jurisdiction boundaries, and overlay districts compiled from county assessor and planning records.

County assessor· SRC-03County planning GIS· SRC-04
Permitting & PlanningConflicting

Permitting and planning signals

Conditional use, reclamation, site plan, and historical permit activity pulled from planning department portals where published online.

County planning portal· SRC-05State permitting portal· SRC-06
Environmental / SitingVerified

Environmental and siting considerations

Sensitive habitat overlays, fire severity zones, flood zones, agricultural designations, and known site constraints from mapped public datasets.

CDFW BIOS· SRC-07Cal-Adapt· SRC-08
Project ActivityVerified

Relevant nearby project activity

Operating, queued, and recently withdrawn projects near the site — sourced only where a public record exists. No inferred or rumored projects.

CEC project database· SRC-09EIA-860M· SRC-10
Source Trail & UnknownsVerified

Source trail and unresolved questions

Every finding carries its source. Missing data is flagged as Unknown; conflicting data is flagged as Conflicting. Questions for next-stage diligence are listed.

Source register· SRC-REG

Scope note: source availability varies by site and jurisdiction. The exact source set is determined during screening; findings that cannot be sourced remain Unknown rather than inferred.

How it works

From candidate site to organized evidence

A focused four-step workflow. We handle the research friction so your team can spend time on the decisions that matter.

  1. 01Takes minutes

    Provide the site

    Send us a candidate California BESS location — address, APN, parcel, or coordinates. Tell us what you’re evaluating.

  2. 02Identified sources only

    We gather and reconcile evidence

    GeoSpatia Labs pulls relevant public-source evidence across grid, parcel, permitting, environmental, and project layers — and reconciles it.

  3. 03Structured + traceable

    Receive a structured brief

    You get a preliminary intelligence brief: findings, sources, unknowns, conflicts, and next-step questions — clearly separated from analysis.

  4. 04Focus your diligence

    Decide where to go deeper

    Use the brief to direct deeper engineering, interconnection, legal, environmental, or permitting work where it’s actually warranted.

Pre-order site preview

Let buyers inspect the site before they order

Search a California address or coordinates, inspect satellite/topographic context, drag the pin to refine the candidate location, then continue into the no-call order flow with the location prefilled.

Loading realistic 3D California basemap...

Preliminary geographic reference only. A geocoded point is not a verified parcel boundary and does not establish grid capacity, interconnection feasibility, or project suitability.
Mapbox Geocoding & High-Res Satellite · GIS overlays available in the paid screen
Deliverable Architecture & Live GIS Preview

What a preliminary site intelligence brief covers

Every brief is manually prepared for your candidate site. Rather than generating synthetic certainty, the deliverable organizes verifiable public records into nine clear diligence sections — with high-resolution aerials, CAL FIRE hazard overlays, and transmission tie-in paths.

INTERACTIVE MAPBOX DELIVERABLE DEMO

Inspect real candidate parcels, fire hazard zones, and grid tie-ins

Search any California address or select a sample APN below to test the spatial evidence viewer your team receives in each brief.

LIVE SATELLITE
Gates 230kV / 500kV Intertie Candidate

⚡ PG&E Gates Substation (0.6 mi NW) · 🔥 CAL FIRE SRA Moderate Wildfire Zone

Section 01

Candidate-Site Overview

Synthesizes candidate location details, assessor parcel identification, general plan designations, and primary developer assumptions for the evaluation.

Section 02

Grid & Interconnection Context

Reviews published utility substation proximity, transmission line corridors, known queue filings in the cluster, and published hosting capacity signals.

Section 03

Parcel & Jurisdiction Context

Documents cadastral parcel boundaries, local municipal or unincorporated county jurisdiction, underlying zoning classifications, and overlay districts.

Section 04

Permitting & Planning Signals

Searches county and municipal planning repositories for conditional use permit (CUP) requirements, hearing records, and discretionary approvals.

Section 05

Environmental & Siting Considerations

Reviews state environmental databases, mapped flood hazard layers (FEMA), CAL FIRE severity zones, and identified biological or wetland buffer intersections.

Section 06

Relevant Project Activity

Catalogs documented operating, queued, or withdrawn energy storage and generation projects within the immediate cluster or substation catchment area.

Section 07

Evidence Classification Framework

Every piece of information is explicitly categorized into Verified by Public Record, Unknown in Available Data, Conflicting Across Agencies, or Deeper Diligence Needed.

Section 08

Identified Source References

Compiles a complete bibliography of statutory records, agency portals, GIS layers, and filings used in the brief with timestamps and publication dates.

Section 09

Questions for Next-Stage Diligence

Translates open questions and flagged conflicts into actionable, specific inquiries for your electrical engineers, legal counsel, and environmental consultants.

Clear diligence handoff, zero fabricated scores

We do not invent customer case studies or display mock sites with fake capacity numbers. The brief gives your team a source-backed summary of what public records show — and equips you with the exact questions to ask formal study engineers and local planning officials.

Founder-led launch offer

Before option spend, get the public evidence organized.

Send us a candidate California BESS site and tell us what you are evaluating. They can inspect the public sample brief first. If the site fits current scope, we confirm the paid screen by email and deliver a structured brief with sources, findings, unknowns, conflicts, and next-step questions — no call required.

Launch pricing begins at $1,500/site. We review scope first; payment is handled after written confirmation, not through a sales call.